This Grade II listed building was built by Thomas Cubitt in the 1830s and is situated in the heart of Belgravia.

Scope of work:

  • Abseiled repairs were undertaken to the stucco render on the side elevation to stop water ingress
  • Abseiled repairs were also undertaken to the wooden sash windows and redecorations were completed
  • The bottle balustrades were replaced to the entrance portico. In addition repairs and redecorations were undertaken of the associated stucco